21 May 2013

Editorial: Australia Needs Strategic Rethink on Submarines

Collins class Submarine
By Ross Babbage

Is Australia’s new submarine program being driven by careful assessments of the country’s future defense strategy or more by short-term electoral considerations? This is a key question leading up to Australia’s national elections on September 14.

The Labor Party government revealed back in May 2012 that it had ruled out the option of a nuclear-powered submarine and commissioned detailed assessments of four conventionally-powered options:

-       An existing off-the-shelf foreign design.
-       A modified off-the-shelf foreign  design
-       An evolved Collins-class design
-       Development of a completely new submarine design in Australia.

Then, when Prime Minister Gillard released the 2013 Australian Defense White Paper on May 3, she announced she’d narrowed the options to the last two. The prime minister also confirmed her commitment to purchase 12 new submarines, which she said would be assembled in South Australia.  In addition, she revealed that the government had commissioned the development of a land-based facility to enable the full-scale testing of submarine propulsion, system integration and support services.

In order to provide sufficient time for this process of design, testing, construction and commissioning, the Minister for Defense, Stephen Smith revealed that the six existing Collins-Class submarines would be extended until at least 2038. No plans were released for the maintenance and upgrading of the Collins Class boats, nor estimates of the costs of operating these boats for 45 and possibly even 50 years.

In light of these developments, what are the main issues now confronting Australia’s new submarine program?

Read the full story at The Diplomat